We Take Pride
In Our Consultative Approach
Quote Process
- Provide your contact information and upload a copy of your electric bill.
- Our team will promptly contact you to confirm receipt and request further details, if necessary.
- Our experts will develop a detailed preliminary design using cutting-edge LiDAR technology and high-resolution aerial photography.
- Following your review of the preliminary design, we will arrange an on-site visit to evaluate your electrical system and property. We will address any questions you may have during this visit and subsequently provide a final quote.
- We take a consultative, design-oriented approach to sales, ensuring a personalized experience for each customer.
Install Process
- Upon receipt of your deposit, we will secure your spot in our installation queue and introduce you to your dedicated project manager.
- Your project manager will keep you informed of the project timeline and schedule a pre-construction site visit to finalize details.
- Our permit coordinator will handle your net metering agreement and acquire the necessary permits for your project.
- The construction phase typically lasts 1-4 days.
- Upon successful completion of the final inspection, we will set up your monitoring portal and conduct a detailed system walkthrough with you.
- Following an inspection of your meter, the utility company will provide permission to operate your system.
Case Studies
NE Seattle Home
• 7.92 kW
• 92.4%: Electrical Offset
• $16,961: Lifetime Energy Savings (Cash Purchase, Assumed 4% Utility Cost Escalation)
Wallingford House
• 10.395 kW
• 67.2% Offset
• $24,525: Lifetime Energy Savings
Magnolia Home
• 13.6 kW System
• 62.5% Electricity Offset
• $34,057: Lifetime Energy Savings
Seattle Home
• 8kW
• 102% Electrical Offset
• $4,808 Lifetime Energy Savings
NW Seattle Home
NW Seattle Home
• 7.4 kW
• 101.6% Offset
• $17,982: Lifetime Energy Savings
Snoqualmie Home
• 18.13 kW
• 77.9% Offset
• $34,079: Lifetime Energy Savings
Beacon Hill Home
• 6.4kW
• 44% Offset
• $13,687: Lifetime Energy Savings
Seward Park Residence
• 11.6 kW
• 115% (to account for future EV use)
• $18,793: Lifetime Energy Savings