The best warranty in the industry!
QUOTE PROCESS:
We take a consultative, design-oriented approach to sales, ensuring a personalized experience for each customer.
Step 1
Provide your contact information and upload a copy of your electric bill.
Step 2
Our team will promptly contact you to confirm receipt and request further details, if necessary.
Step 3
Our experts will develop a detailed preliminary design using cutting-edge LiDAR technology and high-resolution aerial photography.
Step 4
Following your review of the preliminary design, we will arrange an on-site visit to evaluate your electrical system and property. We will address any questions you may have during this visit and subsequently provide a final quote.
Want to get started?
Drop us a line today for a free quote!
INECENTIVES:
Sales Tax Exemption
In 2019, Washington State extended the Sales Tax Exemption for solar photovoltaic (PV) systems up to 100 kW in size in 2019 Senate Bill 5116 – the Clean Energy Transformation Act. This is in effect until 2029 and covers the entire costs of the solar photovoltaic system including materials, labor, permits and any related electrical work necessary for the installation to operate.
Net Metering
Net Metering, an incentive available since 1996 and extended in 2019, is a contract that you sign with your electric utility allowing you to trade power with them at retail rates. When you produce more energy than you consume (running your meter backwards) the excess kilowatt hours, (kWh) are fed into the grid and credited to your account. When you produce less than you consume, you use the credits you’ve built into your account.
As a result, a solar array in the Seattle area may feed excess kilowatt-hours into the grid during the summer. Net Metering allows you to “bank” that extra energy with your utility to be used in the winter months when solar production drops and electricity consumption rises.
Union Rebate
Residential customers who live in King, Clallam, Jefferson, and Kitsap counties will receive a rebate for installing solar with a union contractor. Systems smaller than 5kW will receive $1,000, and systems larger than that will receive $2,000. There are limited funds available for this rebate, but they are unlikely to run out this year.
INSTALLATION PROCESS:
Step 1
Upon receipt of your deposit, we will secure your spot in our installation queue and introduce you to your dedicated project manager.
Step 2
Your project manager will keep you informed of the project timeline and schedule a pre-construction site visit to finalize details.
Step 3
Our permit coordinator will handle your net metering agreement and acquire the necessary permits for your project.
Step 4
The construction phase (typically lasts 1-4 days.)
Step 5
Upon successful completion of the final inspection, we will set up your monitoring portal and conduct a detailed system walkthrough with you.
Step 6
Following an inspection of your meter, the utility company will provide permission to operate your system.
Read customer reviews here:
CASE STUDIES:
NE SEATTLE HOME
• 7.92 kW
• 92.4%: Electrical Offset
• $16,961: Lifetime Energy Savings (Cash Purchase, Assumed 4% Utility Cost Escalation)
WALLINGFORD HOME
• 10.395 kW
• 67.2% Offset
• $24,525: Lifetime Energy Savings
MAGNOLIA HOME
• 13.6 kW System
• 62.5% Electricity Offset
• $34,057: Lifetime Energy Savings
SEATTLE HOME
• 8kW
• 102% Electrical Offset
• $4,808 Lifetime Energy Savings
NW SEATTLE HOME
• 8.25 kW
• 66.7%: Electrical Offset
• $26,637: Lifetime Energy Savings
NW SEATTLE HOME
• 7.4 kW
• 101.6% Offset
• $17,982: Lifetime Energy Savings
SNOQUALMIE HOME
• 18.13 kW
• 77.9% Offset
• $34,079: Lifetime Energy Savings
BEACON HILL HOME
• 6.4kW
• 44% Offset
• $13,687: Lifetime Energy Savings
SEWARD PARK HOME
• 11.6 kW
• 115% (to account for future EV use)
• $18,793: Lifetime Energy Savings
Stay up-to-date on Solar News
Stay ahead of industry changes and new financial incentives. Subscribe to get updates before they expire.